翻訳と辞書
Words near each other
・ Sequencing batch reactor
・ Sequencing by hybridization
・ Sequencing by ligation
・ Sequencing fountain
・ Sequenom
・ Sequent
・ Sequent (disambiguation)
・ Sequent (MUD)
・ Sequent calculus
・ Sequent Computer Systems
・ Sequentia (music group)
・ Sepulveda Boulevard
・ Sepulveda Dam
・ Sepulveda Elementary School
・ Sepulveda Pass
Sepulveda Pass Transit Corridor
・ Sepulveda Point
・ Sepung Bridge
・ Sepura
・ Seputar Indonesia
・ Seputeh Komuter station
・ Seputih River
・ Seputus
・ Sepvigny
・ Sepvret
・ SEPW1
・ Sepx
・ SEPX1
・ Sepy Dobronyi
・ Sepänkylä


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Sepulveda Pass Transit Corridor : ウィキペディア英語版
Sepulveda Pass Transit Corridor
The Sepulveda Pass Transit Corridor is a planned transit corridor connecting the Los Angeles Basin to the San Fernando Valley. Project alternatives along the four mile section of I-405, with an option for a heavy rail or light rail along the corridor; providing bus-only on- and off-ramps for bus rapid transit service on the I-405 carpool lanes; and implementing peak-hour bus rapid transit lanes on the freeway’s shoulders.〔(【引用サイトリンク】url=http://www.metro.net/projects/sfv-405/ )
The most popular idea has been a tunnel, as the rugged terrain of the pass makes surface and elevated alternatives almost equally expensive. Metro Chief Executive Philip Washington has proposed a $20 billion tunnel under the pass containing a toll road and a rapid transit rail line. The project would be financed in partnership with private companies, which would be allowed to collect tolls for a certain number of years. As of 2015, Metro has $1 billion in funds available for construction beginning 2028; thus funding from other sources could be would have to be found as well.〔(Los Angeles Magazine )〕
==Project==

The project is considered a way to relieve freeway congestion and provide an alternative to I-405 through the Sepulveda Pass. A total of $1.0 billion of funding is allotted to the Sepulveda Pass Transit Corridor project under Measure R.〔(【引用サイトリンク】url=http://www.metro.net/measurer/images/expenditure_plan.pdf )〕 Under Measure R, the expected completion of the project is 2039, but with the 30/10 Plan, now known nationally as America Fast Forward, the project could be built in less than 10 years.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Sepulveda Pass Transit Corridor」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.